Page 43 - 2021 文華簡介
P. 43

01                                                修業Siou-Ye (enhance contribution), the Library














                                          修業樓為第三期完成的校舍


                                                  從地下一樓的閱覽室



                                             二樓圖書館到三樓大禮堂


                                                  我們期待學生不斷地


                                                        「更上一層樓」




                                     Siou-Ye Building was completed at the third stage of school
                                     construction. It has reading rooms in the basement and on the
                                     ground floor, book collections on the second floor and an
                                     auditorium on the third floor. When-Hua’s library positions
                                     itself to motivate students to work their way up their reading
                                     ladders.
   38   39   40   41   42   43   44   45   46   47   48