Page 43 - 2021 文華簡介
P. 43
01 修業Siou-Ye (enhance contribution), the Library
修業樓為第三期完成的校舍
從地下一樓的閱覽室
二樓圖書館到三樓大禮堂
我們期待學生不斷地
「更上一層樓」
Siou-Ye Building was completed at the third stage of school
construction. It has reading rooms in the basement and on the
ground floor, book collections on the second floor and an
auditorium on the third floor. When-Hua’s library positions
itself to motivate students to work their way up their reading
ladders.

